The order is the method. Discovery, design, visualization, engineering, permitting, construction, and completion. One line of work, held until the building is finished.
- 01
Discovery
Ambition, constraints, family or brand, and the kind of place the project should become.
- 02
Site and Property Evaluation
Light, storm, views, setbacks, existing structure, and the quiet facts that decide a plan.
- 03
Programming
Rooms, staff, guests, water, landscape, and the calendar of a year in the house or building.
- 04
Concept Design
Massing, sequence, and the first architectural idea — tested, not decorated.
- 05
Schematic Design
Plans, sections, and a material direction precise enough to share with engineering and cost.
- 06
Visualization
Palazzo digital visualization used as a design instrument, not merely a sales image.
- 07
Design Development
Joinery, structure, envelope, and the coordination that makes a drawing buildable.
- 08
Engineering Coordination
Structural, MEP, and civil work inside the Palazzo ecosystem rather than as a late overlay.
- 09
Permitting
Documentation assembled for the jurisdictions of South Florida with construction in mind.
- 10
Construction Documentation
The set from which the building is actually made.
- 11
Procurement
Materials, millwork, and specialty trades — including the Palazzo Showroom where appropriate.
- 12
Construction
Architecture remaining present while Palazzo Construction builds.
- 13
Completion
Punch, commissioning, and the last calibration of light, hardware, and landscape.